Give your product team a complete task to make possible

You have an idea, some feedback and a growing feature list. You do not decide the first version by choosing the easiest screens to draw. You decide it by identifying a useful task that can actually be completed, with its data, rules and failure cases.

This guide from The Entrepreneur Workshop helps you produce a concise PRD — a document specifying the need and requirements — a prioritised backlog and a handover checklist. You do not need to write code: you bring business decisions; the product team translates them into a testable version with the delivery specialists.

1. Distinguish what motivates V1 from what still needs checking

Before choosing features, collect available observations: interview notes, a task observed on a prototype, access constraints, manager feedback and any commercial commitment. Each item needs a date, context, identifier and limitation.

  • Fictional example E1: in a recent account, the assistant describes a request left unassigned because the site address was missing. That suggests checking information; it does not quantify the problem’s frequency.
  • Fictional example E2: during a mock-up trial, the assistant cannot tell whether the manager has replied. That justifies exploring a visible status; it does not prove reliable notification.
  • Proposed constraint C1: cases belonging to two businesses must never be accessible across them. This confidentiality requirement needs technical verification, even if nobody complains during a test.
  • Hypothesis H1: a shared workflow would be preferable to current email tracking. It remains open until real use and its cost have been observed.

Your brief should preserve contradictions. If the owner wants a dashboard but the person handling requests first needs an understandable status, record both expectations. The founder decides the objective; product, design and engineering discuss the response and its risks.

If you lack material, use the customer interview guide. If you have only verbal interest, also test your offer and price. A well-written PRD does not turn a commercial hypothesis into evidence.

2. Describe the workflow from trigger to verifiable result

First write a sentence without naming a tool: “When a request arrives, the assistant can submit it to the manager, obtain a reasoned decision and find its status without asking where it stands.” The beginning and end must be observable.

  1. Create: the authenticated assistant enters an internal reference, site and description, then saves a draft.
  2. Submit: required information is checked. A complete request moves to “To review” and appears in the authorised manager’s list.
  3. Decide: the manager from the same business accepts the case or requests a correction, giving a reason.
  4. Correct if needed: the assistant finds the reason, completes the information and resubmits the request.
  5. Find the result: authorised people see the status and history. “Case accepted” means ready for the next business step, not a scheduled intervention.

This workflow does not necessarily need synchronisation with scheduling software. It does need the decision to be saved and visible. An animation saying “Success” without saving remains a prototype. The business MVP guide (in French) explains the difference; the transition from AI prototype to PRD (in French) provides the framework.

Acceptance completes the workflow. As in the kit’s PRD, directly editing an accepted case is excluded from this pilot. If an error is found afterwards, the assistant goes through the manager and a traceable rectification procedure. Define that procedure before real use; until it exists, the live pilot remains blocked. The product team must not silently invent a return to “Needs correction”.

The GOV.UK Service Manual’s alpha-phase guide encourages exploring risky hypotheses and the user’s whole problem. We take a scoping principle from it, not an obligation to reproduce a British government process.

3. Decide “essential now” versus “later”

For each feature, ask: “Without it, can the task be completed acceptably, or does an essential risk remain unanswered?” Record the evidence or constraint, the decision, the person accountable and the condition for reconsideration.

Essential: check fields on submission
Linked to E1. A message specifies what is missing; the draft is retained. The business owner must confirm which fields are mandatory.
Essential: see status and the reason for correction
Linked to E2. Without this information, the assistant cannot resume the task. A shared list may suffice; automatic email is not mandatory for this pilot.
Essential: manage permissions and history
Linked to C1 and the need to know who decided. This is not a decorative option to postpone for speed.
Later: email notification
No evidence yet that it is necessary if people check the list. Reconsider if users miss decisions despite an understandable status.
Later: attachments and schedule synchronisation
The pilot is limited to requests without mandatory documents or scheduling. If that subset does not really exist or is useless, the choice no longer holds: scope must change.
Outside V1: automatic AI summary
Not needed for the chosen task; it would add questions about answer quality and data handling without evidence of need.

“Later” does not mean promised. The follow-on backlog remains a set of options, reconsidered through feedback and constraints. If a new requirement enters V1, explicitly decide what leaves or what needs reassessment. Scope cannot expand while resources remain unchanged by default.

4. Write roles, data and failure rules before acceptance testing

Who can do what?

The assistant creates and tracks their business’s requests. The manager reviews those requests and decides. The administration account manages access; that does not automatically grant unlimited business access to cases. Engineering must specify and test necessary exceptions, their authorisation and traceability.

What information should you keep?

For this example: request identifier, business identifier, internal reference, site, description, author, status, correction reason and dated events. Avoid customer names or contact details when an internal reference suffices. Retention, deletion, recipients, hosting and support access must be agreed with the relevant owners before real data is used. “To define” on these points blocks the live pilot, not drafting a prototype with fictional data.

What happens when something goes wrong?

  • Missing field: no submission; a field-linked message; entered data retained.
  • Connection interrupted: do not claim a request was transmitted if saving is unconfirmed; allow a status check before retrying.
  • Double click: do not create two requests from one submission.
  • Simultaneous decisions: do not silently overwrite the first; request a refresh and make the conflict understandable.
  • Access to another case: server-side refusal, without exposing another business’s content.
  • Manager absent: define an authorised replacement procedure. The application does not choose a new decision-maker by itself.

The founder confirms the rules; the technical lead defines how to meet and verify them. Your product team should show the result in normal and degraded situations, not just the ideal workflow.

5. Turn the need into Given / When / Then criteria

An acceptance criterion describes an observable condition. The Given / When / Then format sets out a starting condition, an action and an expected result. It supports discussion between business and delivery teams; it replaces neither security testing nor the team’s expertise.

AC1 — Complete submission
Given an authorised assistant and a complete draft belonging to their business
When they submit the request and saving is confirmed
Then exactly one request appears as “To review” in the manager’s list,
with author and date; the assistant sees the same status after refreshing.

AC2 — Correction required
Given a “To review” request and an authorised manager from the same business
When the manager requests a correction with a non-empty reason
Then the assistant sees “Needs correction” and the reason; after correction
and resubmission, status returns to “To review” and events remain visible.

AC3 — Forbidden access
Given a user from business A
When they try to open a request from business B directly
Then the server refuses access and returns neither case content nor history.

AC4 — Uncertain save
Given a submission whose network response is interrupted
When the assistant returns to check status and retries if needed
Then they can find the result without creating a duplicate or a false success.

AC5 — Terminal acceptance
Given a complete “To review” request and an authorised manager from the same business
When the manager accepts the case and saving is confirmed
Then “Accepted”, the decision-maker and the date remain visible
to authorised people after refresh; the case is ready for
the next business step, without claiming an intervention is scheduled.

Add data examples and link each criterion to a backlog row. The GOV.UK documentation on user stories connects needs to acceptance criteria. Our kit adds concrete scenarios adapted to the fictional case.

Acceptance testing checks the delivered version against these criteria and records discrepancies. A user test (in French) answers a different question: does the person understand and complete the task? Both checks are necessary; neither certifies the other.

6. Complete a short PRD everyone can review

Your PRD can stay concise if decisions and their links are explicit. The downloadable template contains a blank version and Nora’s example. It brings together:

  1. The intended decision: test whether a case can be submitted, corrected and accepted without losing its status.
  2. Audience and available evidence: roles, context, observations, contradictions and unknowns.
  3. Workflow and scope: beginning, result, essentials, deferred options and exclusions.
  4. Rules: permissions, required data, states, errors and dependencies.
  5. Acceptance: verifiable scenarios and the people responsible for approving them.
  6. Go-live: environment, authorisations, support, monitoring and rollback.
  7. Measurement and subsequent decisions: records to observe, context, review owner and stop conditions.

Do not ask this document to guarantee a budget or date before dependencies are examined. Tool access, data quality, security obligations or the decision-maker’s availability can change feasibility. Have the people who will build and operate the version estimate scope and risks.

7. Prepare go-live and handover

“Development is finished” is not enough. Before opening the live pilot, agree who can authorise go-live, who handles incidents and who can suspend use. Automated checks do not constitute permission to publish.

  • Founder or business owner: approves scope and business acceptance testing; decides whether to continue, narrow or stop the pilot.
  • Product owner: maintains the PRD, backlog and decision log; organises feedback reviews.
  • Design: checks understanding, error states, keyboard navigation and readability of useful information.
  • Technical lead and QA: verify permissions, backups, restoration, failure scenarios and the release candidate; document defects.
  • Named operations owner: receives alerts, organises support and follows incident and rollback procedures. In a small organisation, one person can hold several roles, but none should be unnamed.

Handover includes the identified version, code and rights agreed in the contract, access delivered through a secure channel, installation documentation, test results, known limitations, support procedure and follow-on backlog. Check that the recipient can find these and perform the agreed recovery. Never put a password in the PRD.

In the fictional pilot, record for each request: attempted submission, saved status, correction requested, acceptance found, human help and incident. An abandoned request stays in tracking with its context; it does not disappear to improve results. Independent completion, frequency of obstacles and support cost inform the decision. Agree an observation window and risk-appropriate criteria with the team; a small pilot does not support statistical generalisation.

If one business can see another’s data, suspend affected access and follow the incident procedure; this is not an improvement to file for later. If the workflow remains unclear, return to the prototype. If users finish the task but see no value, revisit the need or offer before adding features.

What AI can prepare, and what you must decide

AI can structure notes, suggest failure cases and produce an initial backlog. It does not know whether users really encountered a problem, access is authorised or your system protects data. Share only information whose use is authorised, anonymised where necessary.

Using these notes, propose a concise PRD for a product team. Separate sourced observations, confirmed constraints and hypotheses. Describe one task from start to result. For each feature, mark essential or later, with justification, risk and the human decision needed. Invent no interview, price, deadline or technical capability.
[PASTE AUTHORISED NOTES]
Review this PRD as an acceptance-testing owner. Suggest Given / When / Then criteria for the workflow, permissions, missing fields, double clicks, network loss and simultaneous decisions. Flag missing rules instead of deciding them. Link each criterion to a requirement; distinguish a suggested test from a test actually executed.
[PASTE THE PRD]

Your kit for the next conversation with the product team

Upstream, the workshop’s Business Model Canvas and the Lean Canvas (in French) illuminate business hypotheses. Design Thinking (in French) and the Design Sprint preparation kit help explore workflows. After the pilot, the digital roadmap (in French) organises possible next steps without turning them into promises.