# Concise PRD — first-version kit for the product team

Use: duplicate A, fill in decisions with their sources and assign the unknowns. B is an entirely fictional teaching example, not a validated project or a delivery promise. A critical “to decide” item blocks the move to real data.

## A. Reusable template

### 1. Identity and decision
- Project / version / date / product owner: [to complete]
- Business owner making trade-offs / technical lead / operations: [names to assign]
- Decision this version should inform: [to complete]
- Non-goals: [to complete]
- Reconsideration conditions / planned review / owner: [to complete]

### 2. Audience, problem and evidence
- User / buyer / business decision-maker: [distinct roles]
- Most recent concrete situation: [to complete]
- Current solution: [to complete]
- Evidence register: identifier [ ], authorized source [ ], date [ ], context [ ], observation [ ], limitation [ ], contradiction [ ].
- Hypotheses: identifier [ ], assumption [ ], planned test [ ], owner [ ].
- Confirmed constraints: identifier [ ], rule [ ], person confirming [ ], planned check [ ].

### 3. Task and journey
- Trigger / starting state: [to complete]
- Observable final result and what it does not mean: [to complete]
- Steps, role at each step, data, state and permitted human assistance: [to complete]
- Possible manual workaround / owner / acceptable limit: [to complete]

### 4. Agreed scope
For each feature: identifier [ ], must-have / later / excluded [ ], evidence or risk [ ], dependency [ ], acceptance criterion [ ], decision-maker [ ], reconsideration condition [ ].
Do not confuse “later” with a delivery commitment. Every new entry requires a documented trade-off on scope, resources or hypothesis.

### 5. Roles and data
- Role matrix → create / read / modify / decide / administer: [complete by scope and organization]
- Strictly necessary data / origin / purpose / permissions: [to complete]
- Support and administration access / justification / records: [to specify]
- Retention / deletion / recipients / hosting / specialists who validated: [decide before real data]
- Secrets: never in this document; handover channel and owner: [to name]

### 6. Rules and failure states
- Authorized states and transitions: [to complete]
- Missing data / forbidden access / uncertain save / duplicate / simultaneous decisions / absent decision-maker: [expected behavior and human procedure]
- External dependencies / required access / alternatives if unavailable: [to complete]

### 7. Acceptance testing
For each AC: Given [state and role], When [action], Then [observable result], dataset [ ], negative case [ ], owner [ ], execution result and evidence [complete after testing].
- Technical, security and accessibility tests to be defined by specialists: [to complete]
- Business approval by / blocking criteria / explicitly accepted defects and rationale: [to complete]
- An AI suggestion is never an executed test.

### 8. Go-live and handover
- Identified version / acceptance environment / live environment: [to complete]
- Deployment authorization by / date / scope: [to obtain]
- Backup, restoration and rollback tested / evidence / limitations: [to document]
- Support, monitoring and incidents / named people / channel / agreed arrangements: [to define]
- Handover: code and contractual rights, secure access, deployment procedure, documentation, acceptance results, limitations, backlog and knowledge transfer: [locations and takeover acknowledgment].

### 9. Measurement and decisions after use
- Observed events / definition / minimized data: [to complete]
- Attempts, successes, assistance, abandonment and incidents: [keep separate]
- Observation window / audience / review owner: [to agree]
- Continue if / correct if / revisit the need if / suspend if: [contextualized criteria]
- Uncovered risks and limits on generalization: [to complete]
- Resource and milestone estimate: [establish after feasibility review, without an implicit guarantee].

## B. Completed example — Dossier prêt V0 (fictional)

### Decision and responsibility
Test a complete request, correction and decision journey for a maintenance business, without building a scheduling system. Nora makes the business-need decisions and holds the product role in this scenario. The people responsible for engineering, QA and operations have not yet been named: go-live is therefore blocked. No budget or delivery date established.

### Audience and evidence
- Assistant: creates requests and tracks their status. Manager: accepts or requests correction. Business owner: approves the pilot and its access.
- Fictional E1: account of a request without a site address. Limitation: measures neither frequency nor cost.
- Fictional E2: mockup trial in which the assistant cannot find the decision. Limitation: understanding only, with no evidence of an actual save.
- Proposed C1: strict data separation between businesses. Confirm with business stakeholders and test technically; blocking risk.
- H1: the shared journey would be preferable to emails. Unknown to observe; no validated commercial demand in this example.

### Journey and states
Draft → To review → Accepted or To correct → To review after resubmission. An accepted request completes this journey, without meaning a service visit has been scheduled. Editing an accepted file is excluded from the pilot; any error discovered after acceptance goes through the manager and a logged rectification procedure to define before real use.

The authenticated assistant creates an internal reference, site and description. On submission, mandatory fields are checked and the save confirmed. The authorized manager from the same business makes the decision. The assistant can find the state after refresh and, if correction is requested, the reason. A browsable list temporarily replaces email notification, subject to actual usefulness.

### Scope
- M01 must-have: identity and permissions per business, linked to C1.
- M02 must-have: draft and field validation, linked to E1.
- M03 must-have: persisted submission without duplicates, necessary for the journey.
- M04 must-have: decision and correction with a reason, linked to E2.
- M05 must-have: list, state and history, linked to E2 and traceability.
- M06 must-have: understandable conflicts and failures, risk of a lost decision.
- M07 must-have: acceptance testing, operations and handover before a real pilot.
- L01 later: email, reconsider if decisions are missed despite the list.
- L02 later: documents, only if useful requests without mandatory attachments actually exist.
- L03 later: scheduling, reconsider if assignment itself is what delivers the value.
- X01 excluded: AI summary, with no documented need for this task.

### Data and permissions
Request and business identifiers, reference, site, description, author, status, reason and dated events. No customer contact details if the internal reference is enough. The assistant sees their business’s files and corrects returned requests; the manager decides within that same scope. The administrator manages accounts, without an implied universal business permission. Exceptional support access to define and log. Retention, deletion, hosting and recipients: blocking unknowns before real data.

### Expected errors
Missing fields: specific message without losing the draft. Double-click or retry after network loss: do not create duplicates. Conflict between managers: reject silent overwrite and prompt a refresh. Cross-business access: server-side denial without content. Absent manager: explicitly authorized business substitute. Save failure: no false success.

### Proposed acceptance criteria (not executed)
- AC1: Given an authorized assistant and a complete draft, When the submission is saved, Then a single “To review” request appears for the manager and the state persists after refresh.
- AC2: Given a “To review” request, When the manager requests correction with a reason, Then the assistant sees the state and reason; after correction and resubmission, the state returns to “To review” and the history remains.
- AC3: Given user A, When they open a URL for file B, Then the server denies access without content or history.
- AC4: Given a network response lost during submission, When the user checks and then retries if needed, Then only one file exists and its state can be retrieved.
- AC5: Given a complete request, When the authorized manager accepts it, Then the “Accepted” state, its author and the date are visible after refresh; no service visit is declared scheduled.
- AC6: Given two managers who opened the same version, When one decision has already been saved and the other is then submitted, Then the conflict is reported without overwriting the persisted decision.
- AC7: Given a draft without a site, When the assistant submits it, Then no transition to “To review” occurs, the site is flagged and the other fields are retained.

### Go-live and handover
First, an acceptance environment with fictional data and accounts for each role. Then only, if permissions and data are validated, a pilot within an agreed scope with business approval, an identified version, and verified backup and rollback. No real deployment is authorized by this document. Name the operations owner and define incident handling. Hand over documentation, code and agreed rights, access through a secure channel, test results, limitations and backlog. The person taking over confirms they can find the elements and apply the agreed procedure.

### Measurement and decision
Observe submission attempts, actually saved states, corrections, accepted decisions successfully found, assistance, abandonment and incidents; no customer content in measurement. Agree the observation window and usage criteria before the pilot. Suspend if another business’s data is visible; correct if the task is misunderstood; revisit the need if the task is completed without perceived usefulness. No universal threshold or generalization from this pilot alone. Still-open conditions: real research, costs, access, named owners and data protection requirements.