# MVP scoping, acceptance testing and handover checklist

Copy this checklist into your project folder. For each checkbox, add **owner, date, evidence link and any reservation**. A checked box means a check has been performed, not an intention. Project version: [ ]. Business decision-maker: [ ]. Product owner: [ ]. Technical lead: [ ]. Operations: [ ].

## Scope before committing to implementation
- [ ] A useful task is defined from trigger to observable result.
- [ ] Users, buyer and person making trade-offs are identified.
- [ ] Observations have a source, date, context and limitations; fictional examples are not used as evidence.
- [ ] Commercial hypotheses remain separate from usage observations.
- [ ] Every must-have feature refers to evidence, a journey dependency or a risk constraint.
- [ ] “Later” options have a reconsideration condition, without automatic commitment.
- [ ] Exclusions are understood and a genuinely useful subset remains.
- [ ] Critical unknowns have an owner and a next test.
- [ ] Feasibility, access and dependencies have been examined by the implementation team.
- [ ] Resources and milestones have been discussed after this scoping, without inferring a guarantee from the existence of the PRD.

## Data and rules — blocking before real data
- [ ] Necessary fields, sources and purposes documented; unnecessary data removed.
- [ ] Each role’s permissions and organizational scope written down and verifiable server-side.
- [ ] Support and administration access restricted, authorized and logged.
- [ ] Retention, deletion, recipients, hosting and applicable rules validated with the appropriate specialists.
- [ ] Statuses, transitions and business meaning understood; “accepted” does not mean that an out-of-scope action has been executed.
- [ ] Decision-maker absence and post-decision rectification covered by an authorized procedure.
- [ ] No secrets or unauthorized customer data in the PRD, backlog or AI tools.

## Acceptance testing on an identified version
Version: [ ]. Environment: [ ]. Results and defects: [ ].
- [ ] Given / When / Then criteria linked to backlog rows.
- [ ] Normal journey executed through to the result, with verification after refresh.
- [ ] Correction request, visible reason and resubmission verified.
- [ ] Final acceptance, author, date and history verified.
- [ ] Missing fields, retained input and useful messages verified.
- [ ] Double-click and retry after network loss verified without duplicates.
- [ ] Simultaneous decision conflict verified without silent overwrite.
- [ ] Attempts to access another business rejected without content leakage.
- [ ] Technical, security and accessibility tests defined by specialists completed with their limitations documented.
- [ ] Task observed with relevant users; assistance and blockers retained in the notes.
- [ ] Blocking defects corrected and retested; non-blocking reservations explicitly accepted by the appropriate person.
- [ ] Business approval recorded for this version, not for an earlier mockup.

## Limited deployment — separate authorization
- [ ] Authorization owner named and agreement recorded for the actual scope.
- [ ] Real access and data limited to the authorized pilot.
- [ ] Backup, restoration and rollback verified; limitations and data impacts known.
- [ ] Monitoring, support channel and person receiving incidents defined under agreed arrangements.
- [ ] Procedure for suspension in case of a leak, data loss or another critical incident available and understood.
- [ ] Users informed of pilot status and limitations; help contact identified.
- [ ] Minimized measurement defined: attempts, persisted results, assistance, abandonment and incidents.
- [ ] Observation window and decision review agreed with their owner.
- [ ] No automated test pipeline constitutes implicit authorization to go live.

## Handover and continuity
- [ ] Code version and location identified; ownership rights and arrangements comply with the contract.
- [ ] Access handed over through a secure channel to authorized people, with no secrets in documents.
- [ ] Installation, dependency, configuration and deployment documentation handed over.
- [ ] Test results, limitations and known defects accessible to the person taking over.
- [ ] Support, backup, incident and rollback procedures handed over.
- [ ] Up-to-date PRD, decision log and follow-on backlog handed over.
- [ ] Person taking over can find these elements and perform the agreed takeover; actually checked, not merely an email sent.
- [ ] Post-delivery responsibilities agreed; no unlimited maintenance assumed.

## Decision after the pilot
- [ ] Results placed in the context of the pilot’s audience, setting and limitations.
- [ ] Refusals, abandonment, assistance and incidents retained without favorable selection.
- [ ] Decision documented: continue / correct / revisit the need or offer / suspend.
- [ ] Every change has an owner and a new scope decision.
- [ ] No internal quality score is presented as market evidence, an SEO metric or a usage guarantee.

## Decision worksheet to complete
- Version and period observed: [ ]
- Useful results and evidence links: [ ]
- Contradictions and limitations: [ ]
- Unresolved risks: [ ]
- Decision / rationale / owner / date: [ ]
- Next action and reconsideration condition: [ ]